Project Description
University of Arizona Dr. Andrew Weil Center for Integrative Medicine
This new 34,000 GSF facility for the Arizona Center for Integrative Medicine (CIM) will facilitate the fundamental goal of creating a physical environment that supports the evidence-based philosophy of integrative medicine. The center will comprise three buildings that will designate UA as the epicenter for integrative health in the future. The three-story main building is a steel frame structure consisting of a composite steel beam and girder system with steel moment frames and concrete shear walls for lateral loading. The structural system of the one-story conference classroom consists of a steel frame structure with masonry shear walls. Estimated construction completion date: 2023. The project is tracking to be LEED Silver Certified.